PROBLEM
- Client is currently purchasing 40% of half gal and gal jugs from outside blowmolders due to equipment reliability issues in 3 blowmolds. The weekly cost variants ranged from 20,000 to 25,000. The total cost savings opportunity to eliminate outside purchases was 509,000.
- Data collection on the blowmolds was inconsistent and no reliable information was available to manage performance.
- The 3 blowmolds undersupply the filler by 873 jugs per hour at the OEE rate of 82%
- The half gal blowmold has one head that is not operational due to mold reliability issues which equals a 12.5% OEE loss.
APPROACH
Operators begin collecting data on the blowmold in the following areas:
- No of bottles produced per day/ hour
- Delay times and types
- Pounds of scrap and regrind
Identified top 3 downtime reasons
- Cooling bed lubrication
- Dirty and cracked molds
- Lack of operator trouble-shooting skills, including incorrect weight adjustments and Parison adjustments.